Cosmo
It depends on the contracted rate & timeframe between the Operator & ENSCO. I haven't checked ENSCO's July fleet status report for the figures & timeframe. They've got a semi-sub at Ichthys at USD360k/d. So the Jackup dayrate should b lots cheaper then a semi-sub (ballpark in the low to mid 100's or thereabouts) plus extra expenses for the test gear/contractors etc.
As for testing etc, don't think they'll do a barefoot DST (ie without running casing).
Safe practice is to log the section, then case it then drill on to TD & run logs again to identify any further zones of interest. That way u've protected the drilled Reservoir from further exposure to the drilling fluids.
Multiple sand packages can b tested from bottoms up (ie lowest sand then move upwards to test any others) &/or co-mingled. They should have the mobility/drawdown data from the MDT tool, so can choose the best interval to test or skip a flowtest if required. I never understood the rationale behind coming back later to appraise a well other then commercial reasons etc, although they should have factored in extra bucks in their AFE. Hope this helps.
- Forums
- ASX - By Stock
- CVN
- munch munch munch
munch munch munch, page-232
-
- There are more pages in this discussion • 808 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $259.4M |
Open | High | Low | Value | Volume |
14.5¢ | 15.0¢ | 14.5¢ | $41.60K | 285.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 1372632 | 14.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
15.0¢ | 1297669 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 20000 | 0.150 |
10 | 1222632 | 0.145 |
15 | 2383294 | 0.140 |
3 | 462000 | 0.135 |
5 | 526937 | 0.130 |
Price($) | Vol. | No. |
---|---|---|
0.150 | 1078801 | 9 |
0.155 | 1061157 | 15 |
0.160 | 869989 | 16 |
0.165 | 245510 | 7 |
0.170 | 477678 | 10 |
Last trade - 16.10pm 16/09/2024 (20 minute delay) ? |
Featured News
CVN (ASX) Chart |