    I don’t think so. Given that the Kanuka pegmatites have been mined down 15 metres by mnr, the soil zone and the weather zone would have been removed already. Thus, they don’t need to drill deep.

    I think they are drilling 15000m at Kitololo because they need to drill deeper to get through some 15 -30m if weathered pegmatites zone. I would do the same too.

    Cr will probably be in sept or October though as they need money to fund the Kitololo drilling. Can we get money for the floatation of hall peak project this quarter?

    IMO. Dyor.