FeSi to Indonesia US$1600/tonne. O.43 tonnes of FeSi required to produce 1 tonne of MC FeMn.
Do your own calculations FeSi 0.43t X US$1600 = US$688 + 2.4 tonnes of Mn ore + coke + 2500KWh at US$.09c/Kwh (US$225)+ labor + consumables electrodes etc = ?
Less management fees, interest at 20%, transport costs of inputs and exports
- Forums
- ASX - By Stock
- GMC
- Ann: Gulf Receives Operating Licence
Ann: Gulf Receives Operating Licence, page-29
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)