ORP 3.13% 3.1¢ orpheus uranium limited

torrens update, page-3

  1. 116 Posts.
    The initial batch of independently analysed petrological samples from TD004
    were summarised as follows.
    An iron oxide-copper-gold (IOCG) environment is considered
    appropriate to account for the calcic and potassic alteration in the initial
    alteration stage, presence of significant amounts of Fe-oxide minerals
    (early magnetite, late hematite) in both alteration stages, and tendency
    for Cu (+/- trace Zn, Pb) to be concentrated in the later alteration stage
    with hematite.
    Mason Geoscience Pty. Ltd., 25 January 2008 – Petrographic Descriptions for Twenty
    Drill Core Rock Samples, Lake Torrens – Andamooka Island Project, South Australia.
    Basement sulphide mineralisation was evident in all three drill holes
    (Appendix 1). Plate 1 shows mixed pyrite/chalcopyrite mineralisation between
    534.1m and 536.2m in drillhole TD004.
    The Joint Venture is very encouraged by the geological units intercepted in
    Phase One of the program. The quality of the exploration targets remain
    world class and the results received to date have strengthened the Joint
    Venture’s commitment to continued exploration.
    The drilling contractor, Boart Longyear, has completed the 3,000m Phase
    One contract and the drilling rig temporarily left the site after completion of
    TD006. The preferred contractor for Phase Two is also Boart Longyear.
    Phase Two
    An additional gravity survey, selectively infilling the gravity station grid to 250
    by 250m, has commenced. Supplementary gravity data will further refine the
    geophysical models for the targeting of Phase Two drilling.
    A Structural Geologist has been engaged to further interpret drill core and
    assist in identifying the orientation and nature structures potentially controlling
    mineralising events in a local and regional context.
    Drilling will recommence on receipt and interpretation of outstanding results,
    revision of the geophysical model and the grant of further statutory approvals.
 
watchlist Created with Sketch. Add ORP (ASX) to my watchlist
(20min delay)
Last
3.1¢
Change
-0.001(3.13%)
Mkt cap ! $5.884M
Open High Low Value Volume
3.1¢ 3.1¢ 3.1¢ $66 2.142K

Buyers (Bids)

No. Vol. Price($)
1 4312 3.1¢
 

Sellers (Offers)

Price($) Vol. No.
3.2¢ 674 1
View Market Depth
Last trade - 12.57pm 08/11/2024 (20 minute delay) ?
ORP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.