AYO unknown

news

  1. 359 Posts.
    Operations to retrieve the jars and remaining stuck drill string from the hole
    were unsuccessful. No further
    attempts are going to be made to extract the stuck pipe, as there is a very low
    probability of success. A
    cement plug has been set across the top of the 7 inch liner from 3,720 metres
    back to 3,680 metres.

    The joint venture has now approved a proposal to sidetrack a further time from
    above the reservoir by
    milling a window in the 95/8 inch casing at around 3,680 metres, which the drill
    string will pass through. A
    new hole would then be drilled from that point to a depth of approximately 4,300
    metres with a KCL
    fluid.

    Following the release of the attached announcement, trading in Amity's shares
    will commence at open tomorrow morning, 9 January 2004.


    Regards


    Amity Oil Limited
    www.amityoil.com.au
 
watchlist Created with Sketch. Add AYO (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.