1. Celima is proposing to drill 3 wells in the british columbia acreage.
2. two of the wells will have 2500 m horizontal sections which will be fracture stimulated before being put on an extended production test
3. The company has reviewed completion techniques employed on over 500 wells with the 75 km raduis of its drilling location to ensure its well designs are optimised to match the performance improvements of other operations in british columbia.
Add to My Watchlist
What is My Watchlist?