FMG 1.56% $18.97 fortescue ltd

one damn good report, page-8

  1. 1,766 Posts.
    lightbulb Created with Sketch. 50
    They have exceeded expectations. Left the doubters beating their own drums and nothing more. The key point is that FOO is on schedule in May. If track laying is off by a few weeks, doesn't matter as the heavy loader trucks will be trucking Ore to the load point further up the trackway. Read the reports.
 
watchlist Created with Sketch. Add FMG (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.