Couple of things that might contribute to the cost difference:
- Cauchari will be producing battery grade eventually so costs include purification processing that is not present in Olaroz Stage 2
- AAL costs will include site infrastructure (roads, power, gas pipeline, brine bores and pipes etc) that have already been built at Olaroz.
- Forums
- ASX - By Stock
- AKE
- Ann: Advantage Lithium release study on Cauchari JV
Ann: Advantage Lithium release study on Cauchari JV, page-7
Featured News
Add AKE (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online