RBM redbank mines limited

results confirm near surface copper oxides

  1. 20,457 Posts.
    lightbulb Created with Sketch. 269
    Redbank Mines Limited
    3 April 2008
    Interim infill drilling results confirm near
    surface copper oxides at Azurite
    As part of the Redbank Oxide Copper Project expansion
    definitive feasibility study (DFS) announced on 25 March
    2008, infill and definition drilling is being carried out on the
    Bluff, Azurite and Redbank deposits. This will enable
    detailed pit planning and mine scheduling to be completed.
    Preliminary results for the Azurite Deposit are reported
    here. Further preliminary results from Redbank and Bluff
    will be reported as program progresses.
    A total of 10 shallow drill holes were drilled for a total of
    311m at Azurite. Preliminary assaying of the holes has
    been completed using field portable XRF. Quality
    assurance and quality control routines demonstrate that
    these results are satisfactorily consistent and reproducible
    and typically within 15% of conventional laboratory assays.
    These results are reported as interim results (refer Table
    1) and should be regarded as indicative pending reporting
    of final laboratory assays expected in 4 to 6 weeks.
    Highlights from the drilling to date at Azurite:
    Hole No
    length grade
    Cu
    from
    AZ08 19 14 m 1.48% 5 m
    AZ08 20 4 m 1.25% 16 m
    AZ08 21 17 m 1.33% 7 m
    AZ08 22 12 m 1.74% 4 m
    AZ08 24 8 m 2.08% 4 m
    AZ08 25 10 m 1.31% 1 m
    AZ08 28 5 m 5.55% from 9m, including
    2m at 11.53%
    The drilling was carried out in a close spaced pattern over
    the centre of the mineralisation defined by previous drilling.
    The results are consistent with a shallow ore body
    developed by oxide dispersion from a series of small
    fissures (see figure 1). The spectacular intercept in AZ08-
    28 of 5m@ 5.5% Cu containing 2m@ 11.53% represents
    one of these small fissures and the focus of the high grade
    ‘ore picking’ in the historical production period.
    RC Drilling at Azurite – March 08
    Redbank Mines Limited
    ASX Announcement – ASX Announcement 3 April 2008 2
    Grades are consistent or slightly higher than the average previously calculated for the inferred
    resource at Azurite. Located only 1.5km from the Redbank Plant the Azurite oxide
    mineralisation should provide an easily accessible ore source for the proposed expansion of the
    oxide leach operations.
    The Redbank deposit is presently being drilled with preliminary results expected within two
    weeks.
    Yours faithfully,
    Redbank Mines Limited
    Jerome G Vitale
    Managing Director
    Competent Person:
    The information contained in this announcement, insofar as it relates to the Company’s exploration results
    at the Redbank Copper Project, is sourced from information compiled by Dr D James Searle, B.Sc, PhD,
    MAusIMM,. Dr Searle is an Executive Director of Redbank Mines Limited and has sufficient expertise
    relevant to the style of mineralisation and type of deposit under consideration and to the activity which he
    is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code
    for Reporting of Mineral Resources and Reserves’. Dr Searle has approved the inclusion of the statement
    in the form and context which it appears.
    Redbank Mines Limited
    ASX Announcement – ASX Announcement 3 April 2008 3
    Figure 1
    Redbank Mines Limited
    ASX Announcement – ASX Announcement 3 April 2008 4
    Table 1
    Significant (>0.5% Cu) interim results from infill and resource definition drilling at the Azurite Deposit.
    Final results will be reported when available in 4 to 6 weeks time. All holes have a 60o declination to
    180o. Easting and northing are in GDA94 format +/1m.
    Deposit Hole No
    Easting
    m
    Northing
    m
    From
    m To m
    Intercept
    m Cu %
    AZ08 19 793470 8098860 5 19 14 1.48
    26 30 4 0.69
    AZ08 20 793470 8098850 5 13 8 0.69
    16 20 4 1.25
    AZ08 21 793470 8098840 1 3 2 1.01
    7 24 17 1.33
    AZ08 22 793460 8098850 4 16 12 1.74
    32 33 1 0.75
    AZ08 23 793460 8098840 5 6 1 1.23
    11 15 4 0.86
    16 17 1 0.52
    18 19 1 0.82
    25 26 1 0,52
    AZ08 24 793460 8098830 4 12 8 2.08
    AZ08 25 793450 8098850 1 11 10 1.31
    19 22 3 0.87
    AZ08 26 793450 8098840 1 7 6 0.83
    17 20 3 0.82
    AZ08 28 793480 8098840 9 14 5 5.55
    Including 9 11 2 11.53
    17 20 3 1.87
    24 27 3 0.91
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.