KIN 3.45% 5.6¢ kin mining nl

Ann: Presentation to General Meeting, page-7

  1. 842 Posts.
    lightbulb Created with Sketch. 302
    I have been wondering about the power supply and what gains there might be to make there. The original plan was for a BOOT contract for 6 1250kW diesel generators, 4 of which would operate continuously.

    But the DFS did not say how much of the processing cost was attributed to power generation. Someone can jump in here if I have got this wrong, but according to back of my envelope diesel generation costs more than .30 per kWh. Kin's continuous use was to be 5 MW, which makes diesel generation the main component of the LOM processing costs - more than $100 million I think, assuming the price of diesel doesn't go through the roof. Say $13 million a year.

    As I understand it miners are moving away from diesel to hybrid systems which can reduce costs considerably. For example, Resolute recently claimed they can reduce power costs by 40% by going to a hybrid system (
    https://www.rml.com.au/uploads/7/2/0/8/72081691/1817105.pdf )

    If the expanded reserve / mining plan extends the LOM then presumably the risk associated with diesel (price rises)  increases and the benefits of hybrid systems are even greater.

    Conclusion - revisiting the power supply has the potential to substantially improve the project economics and reduce risk, if I have got this right - there is a potential saving of more than the current MC.

    (Definitely DYOR on this - my figure might be way off.)
 
watchlist Created with Sketch. Add KIN (ASX) to my watchlist
(20min delay)
Last
5.6¢
Change
-0.002(3.45%)
Mkt cap ! $65.97M
Open High Low Value Volume
5.8¢ 5.8¢ 5.6¢ $12.51K 219.8K

Buyers (Bids)

No. Vol. Price($)
4 443745 5.6¢
 

Sellers (Offers)

Price($) Vol. No.
5.7¢ 331868 1
View Market Depth
Last trade - 15.59pm 23/07/2024 (20 minute delay) ?
KIN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.