Same I want to be a long term holder as well. Although I do think if they get this plant off the ground and performing well they will be a takeover target. They are miles ahead of the game. They have the Kaolin supply and the patent as well for their process.
In terms of the T/H the other day I think the Company thought they were close too signing but I think something may have potentially come up with the ground / site works that may alter the bottom dollar. Hence the recent ann about the site works. It was a bit of a nothing announcement and not to knock the company but they have had a few of those over the years.
I hope its nothing bad but if theres more work then originally thought then its a bigger loan required.
I think if this site work / ground testing is ok then ATC can sign and due dilligence will be complete.
- Forums
- ASX - By Stock
- ATC
- Ann: Altech - Geotech Survey at Johor HPA Site Well Advanced
Ann: Altech - Geotech Survey at Johor HPA Site Well Advanced, page-26
-
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ATC (ASX) to my watchlist
|
|||||
Last
5.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $85.52M |
Open | High | Low | Value | Volume |
5.0¢ | 5.1¢ | 5.0¢ | $51.20K | 1.021M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 1788510 | 5.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.1¢ | 387774 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 892710 | 0.050 |
4 | 389867 | 0.049 |
4 | 120417 | 0.048 |
4 | 59112 | 0.047 |
5 | 245201 | 0.046 |
Price($) | Vol. | No. |
---|---|---|
0.051 | 387774 | 5 |
0.052 | 559480 | 3 |
0.053 | 126310 | 3 |
0.055 | 132000 | 2 |
0.056 | 39000 | 1 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
ATC (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online