The current hole that has been drilled and has encountered gas
does key have rights to further holes drilled in the area by the operator?
I assume they would pay 20% or 25% whatever their stake is and they have rights to the block ??
or do they only have rights to this hole?
can someone else come and drill the 60m column>? or can the operator drill a second hole and exclude key ?
- Forums
- ASX - By Stock
- KEY
- keys rights to further drilling in tanzania
keys rights to further drilling in tanzania
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KEY (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.262M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KEY (ASX) Chart |
Day chart unavailable