AUZ 6.67% 0.8¢ australian mines limited

A question please, page-5

  1. 3,068 Posts.
    lightbulb Created with Sketch. 4564
    Hi Interested Onlooker
    I think in a thread call, Bankable feasibility study, quite a few points were posted.

    This report below is also a good read, I have posted it a few times previously to judge costs.
    It just about got another companies true BFS Capex costs correct well before DFS release and correctly called out underestimated Opex costs before credits.
    Things to take into consideration in costings in this report are locations, many sites had to build big ports to transport product and import fuels and reagents, road networks were required to be built, power station constructions, water networks and extensive use of expat experience to guide less skilled local workforces.

    https://www.google.com/url?sa=t&amp...egQIABAB&usg=AOvVaw2lnE2PPsZjR3fxpt1F1uSV
 
watchlist Created with Sketch. Add AUZ (ASX) to my watchlist
(20min delay)
Last
0.8¢
Change
0.001(6.67%)
Mkt cap ! $11.18M
Open High Low Value Volume
0.8¢ 0.9¢ 0.8¢ $56.30K 7.011M

Buyers (Bids)

No. Vol. Price($)
39 10199308 0.7¢
 

Sellers (Offers)

Price($) Vol. No.
0.9¢ 2965332 13
View Market Depth
Last trade - 16.10pm 04/10/2024 (20 minute delay) ?
AUZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.