Don't think today's announcement was positive at all.
Though not being negative, the dewatering could take more than 12 months.
The water is an issue atm and the larger pump is still not getting to higher gas readings. However "if" that water is cleared out and the gas flows strong, then the SP will take off.
It's a gamble and waiting game atm.
Totally different structure to the Surat Basin.
DYOR
- Forums
- ASX - By Stock
- GLL
- Ann: Glenaras Gas Project - Production Update
Ann: Glenaras Gas Project - Production Update, page-6
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Week 31 Wrap: JORC rules to get tougher; RBA rate hike chance 50/50; US Fed Sept cut still the quo
BOE
Uranium prices on the NYMEX are stable, but ASX uranium stocks are sinking on Friday. The answer lies in Kazakhstan
Add GLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.8¢ |
Change
0.001(5.88%) |
Mkt cap ! $6.115M |
Open | High | Low | Value | Volume |
1.8¢ | 1.8¢ | 1.8¢ | $486 | 27K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 173000 | 1.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.9¢ | 98813 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 173000 | 0.018 |
2 | 400000 | 0.017 |
5 | 567000 | 0.016 |
3 | 1220000 | 0.015 |
1 | 80000 | 0.014 |
Price($) | Vol. | No. |
---|---|---|
0.019 | 98813 | 1 |
0.024 | 115000 | 1 |
0.025 | 122932 | 2 |
0.027 | 47879 | 2 |
0.050 | 25000 | 1 |
Last trade - 11.03am 08/08/2024 (20 minute delay) ? |
Featured News
GLL (ASX) Chart |