OEL 7.69% 1.2¢ otto energy limited

SM71 Production data, page-24

  1. 4,809 Posts.
    lightbulb Created with Sketch. 2241
    I doubt that they will side track before they have depleted all the sands that they found to have pay .

    They obviously have to mobilise a rig to sidetrack , imo would be better drilling another new well and sticking to the stated plan for F2 and do the sidetrack after they had had depleted those small pools , probably a year or two down the track and possibly a time when they were ready to drill the fifth well on the platform .


    gltah

 
watchlist Created with Sketch. Add OEL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.