At the Mean (Best Estimate)
F&D = $4.97M/1.3MmBoe = $3.82/BoE+ a little for tanks and gas gathering line to tie into main pipe.
21% oil
so the BOE/BO $value is {[($55 WTI) x 21]+ [(6 x $3 HH) x 79]}/100 = ~$25.77BoE on an adjusted basis. Compared to SM71 BoE (close to 85%) of ~ $49.45 (using the same metric).
At that price index it will take $4.97M/$25.77/BoE = 192,860 BoEs (15% of our share @NRI) to pay for CapEx (need to make a time adjustment).
No idea on expected flow rate ... 10 Year EUR? so maybe a 1 year CapEx payback???
Check the math ... done quickly.
Did I miss something in a prior post which contain a pic from BYE that referenced "Averaged realized price for oil, adjusted for transportation, processing fees and uplift ~= (WTI - US$3.30)". Don't they realize they get LLS?
Only money.
- Forums
- ASX - By Stock
- OEL
- Ann: Lightning Exploration Well Commences Drilling
Ann: Lightning Exploration Well Commences Drilling, page-2
-
-
- There are more pages in this discussion • 43 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OEL (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.2¢ |
Change
0.001(9.09%) |
Mkt cap ! $57.54M |
Open | High | Low | Value | Volume |
1.2¢ | 1.2¢ | 1.2¢ | $1 | 92 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 5214781 | 1.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.2¢ | 960978 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 3214781 | 0.011 |
12 | 18687452 | 0.010 |
1 | 100000 | 0.009 |
3 | 370247 | 0.008 |
2 | 550000 | 0.007 |
Price($) | Vol. | No. |
---|---|---|
0.012 | 411284 | 3 |
0.013 | 8747894 | 12 |
0.014 | 12096952 | 12 |
0.015 | 4127000 | 5 |
0.016 | 714285 | 1 |
Last trade - 10.06am 06/09/2024 (20 minute delay) ? |
Featured News
OEL (ASX) Chart |