    “We also know from the drilling at Sinclair that there in more caesium below the level of the bottom of the existing excavation”

    Maybe the extra 57% IS the material thought to be at the base of the pit.

    The cash out for next quarter could be balance of
    invoices for work already completed but as at 31/12 not invoiced or invoiced but unpaid and the balance of crushing costs.
 