Double Bay from the announcement: Open flow rates after acid stimulation increased by a factor of ten from a natural open flow rate of 29 Mcf/day to over 300 Mcf/day. (FOR THE OTHER INVESTORS WELL) „h The Aus-Tex PC1 (The Wilkerson 2A) gas well is now scheduled for acid stimulation and pipeline connection this week. This well was originally drilled in November 2007 and produced a natural open flow rate of 265 Mcf/day. (OUR WELL).
In both references they talk of "natural open flow rate" - other investor is 29Mcf, ours is 300 Mcf - both before stimulation. That's the way I read it.
AKK Price at posting:
0.0¢ Sentiment: Hold Disclosure: Held