use your brain, CDR was completed in October 2018.
This report shows costs incurred to 30/6/18
How do they incur construction costs to 30/6/18, prior to the CDR being completed? Explain that to me
A Critical Design Review (CDR) is a multi-disciplined technical review to ensure that a system can proceed into fabrication, demonstration, and test and can meet stated performance requirements within cost, schedule, and risk.
- Forums
- ASX - By Stock
- SAS
- Ann: Voluntary Suspension Extension
Ann: Voluntary Suspension Extension, page-138
-
-
- There are more pages in this discussion • 109 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)