Sorry major construction contracts do not work that way, the contractor will be trying to complete the works as soon as possible, delays without cause will cost the Contractor significantly and will be seen in very poor light if the dispute ends up in arbitration.
- Forums
- ASX - By Stock
- HRR
- Ann: Sedgman Claim Rejected and Heron claims Liquidated Damages
Ann: Sedgman Claim Rejected and Heron claims Liquidated Damages, page-10
-
-
- There are more pages in this discussion • 64 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)