i was using the 50tph throughput for 108,000 tpqtr @ 5% zinc 2% lead and 1% copper recoveries are the variable but I used lower then reported and used lower metal prices but I believe it is very achievable and way under plant capacity @ 436ktpa
CSD Price at posting:
25.0¢ Sentiment: Hold Disclosure: Held