Hey Aussie,
Just been going off the timelines given.
From the 20th FEB announcement.
"Preparation for Production Testing Underway" "The equipment and consumables required for the water pumping and reservoir stimulation operations are already on site. Stimulation is scheduled to commence at the Calima-2 well in the next few days, with each well expected to take 6-7 days."
I guess it depends on what they meant in regards to the "next few days"
4TH MARCH
"Calima Energy Limited (ASX:CE1) (“Calima” or the “Company” is pleased to advise that reservoir stimulation operations at the Calima-2 and Calima-3 wells have been initiated."
Does this mean they have finished fracking Calima 2 Well & moved onto 3?
"CalFrac Well Services have commenced reservoir stimulation operations with each well expected to take 5-6 days."
12 days so far from the 20th, getting close?
- Forums
- ASX - By Stock
- CE1
- Ann: Reservoir Stimulation Operations Commenced
Ann: Reservoir Stimulation Operations Commenced, page-11
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CE1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.571M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CE1 (ASX) Chart |
Day chart unavailable