Finally some news....YAY!!!
HIGHLIGHTS: "Engineering studies to optimise civil design and construction complete
Civil construction costs reduced by 44% to US$175M including indirect costs and contingencies
Optimised process flowsheet and process engineering design nearing completion
Capital and operating cost reductions currently being finalised drawing on highly successful optimisation program
Kvanefjeld on track to become a long‐life, low‐cost producer of rare earth products, critical to clean energy technologies"
Waiting for that next all-important announcement on the mining license app.!??
.
- Forums
- ASX - By Stock
- ETM
- Ann: Engineering Studies Completed
Ann: Engineering Studies Completed, page-2
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ETM (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $28.17M |
Open | High | Low | Value | Volume |
2.0¢ | 2.0¢ | 2.0¢ | $88 | 4.421K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 113115 | 2.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.2¢ | 706863 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 7911 | 0.021 |
3 | 113115 | 0.020 |
5 | 1322280 | 0.019 |
2 | 1205610 | 0.018 |
1 | 1000000 | 0.017 |
Price($) | Vol. | No. |
---|---|---|
0.015 | 42142 | 55 |
0.022 | 706863 | 2 |
0.024 | 856462 | 2 |
0.025 | 845212 | 7 |
0.026 | 483329 | 1 |
Last trade - 10.02am 04/09/2024 (20 minute delay) ? |
Featured News
ETM (ASX) Chart |