Probably depends how quickly they can whip up the pipeline.
They did say tests are still continuing, which I found interesting. What else are they testing for?
But time enough to get the pipes/construction equipment in I'd say at least 2months. But then maybe next door have some spare pipes laying around (small posibility).
- Forums
- ASX - By Stock
- KEY
- whacko da dids...
whacko da dids..., page-18
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KEY (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.262M |
Open | High | Low | Value | Volume |
0.1¢ | 0.1¢ | 0.1¢ | $116 | 116.0K |
Featured News
KEY (ASX) Chart |