morning traders 24 / 04, page-2

  1. 1,231 Posts.
    lightbulb Created with Sketch. 162
    extremely brief of only some of todays anns (typos, dyor, imo, read the origs)

    quarterlies, big and small
    - sri, zmi, bgh, azm, cp1, nst, gor, elo, ftt, kcn, alx, aer, psa, eos, piq, hfr, acw, erx, cr1, ipt, blt, bgt, ais, pab, mcr, m7t,

    gbr
    - narrow/very narrow, lo-grade cu, ni, shallow, very deep results, incl 4.5m @ 0.2% cu, 0.3% ni from 85m, 8m @ 0.3% cu, 0.1% ni from 28m, 3.1m @ 0.5% cu, 0.1% ni from 554m

    min
    - completes us$700m snr unsec notes offering to us instis

    cmw
    - withdraws offer for rdi reit plc

    vcx
    - chair resign/appt

    lam
    - notes us dept comm has completed investigation into nat sec implications of us reliance on imorted u308, us pres 90 days to act or not, could favour us-based producers

    ftc
    - t-linx taken up by tianshan rurla credit bank after 3mth pilot test at one tourist site in xianjing province, test to be expanded to potentially 80 tourist sites, mthly service fee from trcb of rmb30,000

    mgx
    - sale of 65% fe from koolan is, nt, commenced with loading of 72,000wmt for china

    msm
    - susp extended pending release of half yrly

    chk
    - potential iocg feeder zone identified using mt survey and 2d modelling

    sns
    - signs 3yr contract with cairns reg council to provide fully automated parking enforcement solution

    amd/igo
    - rc drilling program commenced at plumridge ni-cu project, wa

    pll
    - maiden jorce resource at central property of piedmont li project, 2.8mt @ 1.34% li2o (ind/inf), total property jorc resource now 19mt @ 1.15% li2o (ind/inf)

    mlm
    - delay to commencement of mining ops at urqhart bauxite project due to inability to currently reach agreement with 3rd party barge loading facility in order for use in 2019

    ajx
    - granted us epa approval to sell alexiflam nf into us - patent pending flame retardant for cotton

    cli
    - ind hemp trial farm in oregon, usa, incresed in size form 150 to 500 acres

    nti
    - not aware response to price query

    hav
    - update on scoping study underway at maldorky/grants fe projects, sa

    avj
    - acquires reamining 50% of 1,200 lot greenfields res dev sw of brisbane

    exl
    - to acquire 25% of petreleaf (fy2018 us$8.1m rev), us-based pet cbd products, for cash and scrip (Us$4.4m/us$1.9m)

    pme
    - signs 7yr, us$14m, tech licensing agreemnt with duke health, usa

    avq
    - mining continues at san jorge ni project, solomin is, workforce returning from surrounding isls after elections, first shipment may, rationale for commencing mining w/out jorc resource and feas studies

    roo
    - increases yield of yardlong beans by 40% against unheated roots control group, by grower in israel

    sil
    - s/h and directors bruhaha

    iod
    - placement at $0.028

    e2m
    - rc drilling porgam at sierra morana au-ag project, argentina, completed, assays pending

    drx/bmt
    sale (by drx) of tick hill au project completed (to bmt) for scrip (in bmt)

    mrq
    - surveys completed at hm sands projects in mozambique, auger drilling ongoing

    srn
    - susp re ann on projects and previously annd tenement acquisition

    par
    - completion of insti entitlement offer at $1.50

    isd
    - copyright tribunal orders grant of interim license by copyright agency
    Last edited by grundlebundle: 24/04/19
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.