Mate, I totally agree and in a long winded kinda way that is what I am really trying to say overall. Why did it take so long to commence the block modelling? Surely, a lot of this planning work could have been started sometime within the last 2 years. They basically had all the facts of the 4 pits to be mined. The decision to mine Pits 1 and 2 first would have been the first thing you think they would have realised based on some elementary review of the total site's predicted yields. Cheers
BSR Price at posting:
1.7¢ Sentiment: Hold Disclosure: Held