    $1.4m is drilling plus connection cost. That is why it is called all-in cost.
    110 wells @$1.4m each is a hefty $154m! This does not include the other infrastructure that need to be built like evaporative ponds etc. Plus WSGP processing plant balance that still not yet paid (unless SXY paid in advance.
 