I doubt if its connected, as they've mapped R/Sth as a separate structure which is bound on either side by smaller incised gully/ canyons that run into the main Canyon.
So assuming if the trap & seal r intact at RS it will b interesting to see what sort of HC's are present (oil, condensate, wet gas like Roc2 or just gas).
Should their new 3D seismic show that it is connected, then in a way RS becomes a step-out well from Dorado-2 and they'll have to drill 1-2 more in between to establish connectivity & OWC etc. Makes it an interesting problem to have.
Do chkout the Section on Slides 10-11 from the presentation.
- Forums
- ASX - By Stock
- CVN
- Ann: Dorado-2 Drilling Update
Ann: Dorado-2 Drilling Update, page-339
-
- There are more pages in this discussion • 82 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
15.5¢ |
Change
0.005(3.33%) |
Mkt cap ! $268.3M |
Open | High | Low | Value | Volume |
15.0¢ | 15.5¢ | 14.8¢ | $55.89K | 372.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 687042 | 15.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
15.5¢ | 610155 | 17 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 687042 | 0.150 |
27 | 1252368 | 0.145 |
12 | 644284 | 0.140 |
8 | 553999 | 0.135 |
8 | 481100 | 0.130 |
Price($) | Vol. | No. |
---|---|---|
0.155 | 616510 | 15 |
0.160 | 1176940 | 19 |
0.165 | 292768 | 10 |
0.170 | 842741 | 15 |
0.175 | 759147 | 9 |
Last trade - 11.52am 05/09/2024 (20 minute delay) ? |
Featured News
CVN (ASX) Chart |