AVZ 0.00% 78.0¢ avz minerals limited

Understanding lithium demand, page-301

  1. 9,099 Posts.
    lightbulb Created with Sketch. 17704
    Reading the article would appear to me that CATL’s GWh capacity in Germany alone will be 60 GWh, with a possibility of 100 GWh by 2026.

    So, what is essentially been said is these numbers translate to LCE need of 54,000 - 90,000 tonnes (i.e. 1 GWh = 900 tonnes LCE), which translates to a 6% spodumene of 405,000 - 675,000 tonnes (i.e. 7.5 tonnes 6% grade spodumene per one tonne LCE).

    Given, at 1.6% Li20 and at a recovery rate of 80% that 4.7 tonnes of ore are required to produce 1 tonne 6% grade spodumene, the above LCE need converts to an installed ore feed capacity of 1.9 million tonnes per annum to 3.2 mtpa.

    With CATL’s other needs, before talk Toyota in your post, probably can see AVZ’s 5 mtpa facility only supplying one to two customers if get a customer of the scale of CATL for example.

    So yes, agree with your view.

    All IMO
 
watchlist Created with Sketch. Add AVZ (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.