Spreadsheet showing drilling progress on Chinguett Not sure how this will turn out. This is a spreadsheet showing a day-by-day progress summary for the Chinguetti and Courbine wells.
xmlns:x="urn:schemas-microsoft-com:office:excel"
xmlns="http://www.w3.org/TR/REC-html40">
Hardman drilling progress
Name
Date (Perth)
Calendar days
Drilling
days
Width
Depth
Action
Share price
Volume
Chinguetti
08-Apr-01
1
1
36
886
drilling
09-Apr-01
2
2
36
886
run and cement 30inch
casing
10-Apr-01
3
3
36
886
pulling out of hole with 30 inch casing landing drill string
11-Apr-01
4
4
26
1460
preparing to run and cement 20 inch casing
12-Apr-01
5
5
26
1460
run and cement 20 inch
casing
13-Apr-01
6
6
26
1460
x:str="'pulling out of hole with 20 inch casing landing drill string">pulling
out of hole with 20 inch casing landing drill string
14-Apr-01
7
7
26
1460
running BOPs
15-Apr-01
8
8
26
1460
running BOPs
16-Apr-01
9
9
26
1460
running BOPs
17-Apr-01
10
10
26
1460
running BOPs
18-Apr-01
11
11
26
1460
completed connecting BOPs
19-Apr-01
12
12
26
1460
preparing to drill
20-Apr-01
13
13
17.5
1537
drilling
21-Apr-01
14
14
17.5
1700
drilling, run wireline
logs
22-Apr-01
15
15
17.5
1700
run 13.4 inch casing
23-Apr-01
16
16
17.5
1700
cementing 13.4 casing
24-Apr-01
17
17
17.5
1700
preparing to drill
25-Apr-01
18
18
12.25
1785
drilling
26-Apr-01
19
12.25
1785
bop problem
27-Apr-01
20
12.25
1785
bop problem
28-Apr-01
21
12.25
1785
bop problem
29-Apr-01
22
12.25
1785
bop problem
30-Apr-01
23
12.25
1785
bop problem
01-May-01
24
12.25
1785
bop problem
02-May-01
25
12.25
1785
bop problem
03-May-01
26
12.25
1785
bop problem
04-May-01
27
12.25
1785
bop problem
05-May-01
28
12.25
1785
bop problem
06-May-01
29
12.25
1785
bop problem
07-May-01
30
12.25
1785
bop problem
08-May-01
31
12.25
1785
bop problem
09-May-01
32
12.25
1785
bop problem
10-May-01
33
12.25
1785
bop problem
0.32
0.8
11-May-01
34
19
12.25
1956
drilling
0.36
4.5
12-May-01
35
20
12.25
2136
drilling, change bit
13-May-01
36
21
12.25
2620
drilling
14-May-01
37
22
12.25
2620
run wireline
logs, trading halt 11:23am
0.38
2.1
Courbine
08-Jun-01
1
36
1332
drilling
09-Jun-01
2
36
1332
x:str="'run and cement 30inch casing">run and cement 30inch casing
10-Jun-01
3
36
1332
pulling out of hole with 30 inch
casing landing drill string
11-Jun-01
4
26
2144
preparing to run and cement 20 inch
casing
12-Jun-01
5
26
2144
x:str="'run and cement 20 inch casing">run and cement 20 inch casing
13-Jun-01
6
26
2144
connecting BOPs
14-Jun-01
7
26
2144
connecting BOPs
15-Jun-01
8
26
2144
connecting BOPs
16-Jun-01
9
26
2144
connecting BOPs
17-Jun-01
10
17.5
2900
drilling, stuck drill
pipe
18-Jun-01
11
17.5
3472
x:str="'drilling (intersect 1st target)">drilling (intersect 1st target)
19-Jun-01
12
17.5
3472
x:str="'run 13.4 inch casing">run 13.4 inch casing
20-Jun-01
13
17.5
3472
cementing 13.4 casing
21-Jun-01
14
17.5
3472
preparing
to drill
22-Jun-01
15
17.5
3472
x:str="'drilling (intersect 2nd target)">drilling (intersect 2nd target)
23-Jun-01
16
12.25
3800
x:str="'drilling, change bit">drilling, change bit
24-Jun-01
17
12.25
4000
x:str="'drilling (intersect 3rd target)">drilling (intersect 3rd target)
25-Jun-01
18
12.25
4800
run wireline logs
- Forums
- ASX - By Stock
- HDR
- HDR- Drilling rig on Site in 2 weeks
HDR
hardman resources limited
HDR- Drilling rig on Site in 2 weeks, page-24
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)