-
Share
585 Posts.
369
19/06/19
11:37
Share
1. Interesting that on the map the title says the dotted red line is the mineralised zone but on the map itself it says it’s the dyke overhang
2. If it’s a cut off line how come there are high grade blow pierce points on both sides of the line?
3. At what level are these lines drawn - meaning level 7, 8 or 9?
4. Thus how do you calc half mined?
5. By definition it is almost impossible to close off a nuggetty deposit.
Hmmm is this the type of area that should be left to the actual professionals at the actual mine?
-