just technical response after massive accumulation at lower prices; but the real value is still way ahead.
look for a retest of the 95-100 range then hopefully it will stay well above 100 for a revaluation closer to production date in aug 04.
THE PLUM THEREFORE is AUZ now; production a fortnite away; technically accumulation stage is over now.
- Forums
- ASX - By Stock
- SMY
- checkout smy vlosed at 80c trading this am @ 83c
SMY
sally malay mining limited
checkout smy vlosed at 80c trading this am @ 83c, page-4
-
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)