Way too fast to have drilled everything! This will be the 8.5" section! Regardless of results we have the lower sections after wireline logging. There is no way they've had time to drill, log, run a liner and drilled everything! Is there?
- Forums
- ASX - By Stock
- CVN
- Ann: Trading Halt
Ann: Trading Halt, page-21
-
- There are more pages in this discussion • 467 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
|
|||||
Last
16.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $295.1M |
Open | High | Low | Value | Volume |
16.0¢ | 16.5¢ | 15.5¢ | $478.3K | 3.010M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 6210 | 16.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.5¢ | 482885 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 6210 | 0.160 |
5 | 400986 | 0.155 |
16 | 1260527 | 0.150 |
9 | 789088 | 0.145 |
6 | 641706 | 0.140 |
Price($) | Vol. | No. |
---|---|---|
0.165 | 482885 | 6 |
0.170 | 1073194 | 9 |
0.175 | 421485 | 8 |
0.180 | 1316600 | 10 |
0.185 | 1036265 | 11 |
Last trade - 16.10pm 26/07/2024 (20 minute delay) ? |
Featured News
CVN (ASX) Chart |