Nice JORC, but lets be honest, the 'lenses' of mineralisation doesn't really start until 100m of rock is removed. And the better stuff outside of the conceptual pit needs about 200m of waste rock to be removed.
The feasibility study IMO will have a 15/1 or 20/1 strip ratio for the LOM, and there will be no opportunity to reduce that in the cash costs.
All IMO -> DYOR.
- Forums
- ASX - By Stock
- LTR
- Ann: Kathleen Valley Lithium Resource jumps 353% to 74.9Mt
Ann: Kathleen Valley Lithium Resource jumps 353% to 74.9Mt, page-48
-
-
- There are more pages in this discussion • 303 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
67.0¢ |
Change
-0.045(6.29%) |
Mkt cap ! $1.624B |
Open | High | Low | Value | Volume |
70.0¢ | 71.0¢ | 67.0¢ | $10.52M | 15.42M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
14 | 385809 | 66.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
67.5¢ | 116000 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 62320 | 0.665 |
12 | 266032 | 0.660 |
3 | 18625 | 0.655 |
23 | 225249 | 0.650 |
3 | 71550 | 0.645 |
Price($) | Vol. | No. |
---|---|---|
0.675 | 11000 | 2 |
0.680 | 189500 | 3 |
0.685 | 50001 | 2 |
0.690 | 35935 | 3 |
0.695 | 20000 | 1 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
LTR (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online