Carmopolis:
Brazil’s largest onshore field
In production since 1963, STOIP = +1.3 Bn Bbl
Production to date = 300 mBbl, currently 25,000 Bbl/day
ERH estimates that 15 to 20% of this from fractured basement play
Oil = 26 deg API
Angelim:
In production since 1968
17 Production wells
This is the part I like from the announcement, bottom of page 2.
Anyone ran a ruler over ERH yet.
Guess a few will be waiting for the flow rates might be a tad late by then.
- Forums
- ASX - By Stock
- ERH
- update
update
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ERH (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
Previous Video
Next Video
SPONSORED BY The Market Online