COK drilling ann today, this is between 1237 and 1261 in the maps earlier on this thread.
BOWEN BASIN DRILLING UPDATE
HIGHLIGHTS
Bowen Basin - Baralaba Area
Ninety one holes drilled for 14,378 metres to June 2008.
Cumulative down-hole coal intercepts of up to 29.7 metres with average intercepts of 6.9 metres, over an area of 4.8 sq km.
Definition of 2.85 km northwards extension of multiple key economic seams in EPC 1047.
The coal zone in EPC 1047 is up to 1.5 km wide.
- Forums
- ASX - By Stock
- TCM
- aquisition of tenements
aquisition of tenements, page-13
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TCM (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
1CG
ONE CLICK GROUP LIMITED
Mark Waller, MD
Mark Waller
MD
Previous Video
Next Video
SPONSORED BY The Market Online