Report from 0600 hrs 7 July to 0600 hrs 8 July 2008
Drilling : Drilled to 975m RKB and stopped to prepare hole for surface casing. Completed a wiper trip to condition hole for casing. Assembled BOPs and pressure testing equipment. Preparing to pull out of hole with drillpipe to run 9 5/8” casing.
Geology : Encountered interpreted top of Cadnaowie Formation at c.951m RKB which is 110m high to prognosed depth of 1061m RKB.
Targets : Prognosed primary reservoir targets are top Algebuckina Sandstone, Poolowanna Formation and the Tirrawarra Sandstone. Other horizons may have potential.
- Forums
- ASX - By Stock
- CTP
- another announcment
another announcment, page-2
-
- There are more pages in this discussion • 62 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTP (ASX) to my watchlist
|
|||||
Last
5.2¢ |
Change
-0.003(5.45%) |
Mkt cap ! $38.48M |
Open | High | Low | Value | Volume |
5.2¢ | 5.2¢ | 5.2¢ | $35.73K | 687.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 550000 | 5.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.2¢ | 99854 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 550000 | 0.050 |
1 | 280000 | 0.049 |
3 | 1230000 | 0.048 |
1 | 100000 | 0.046 |
1 | 60000 | 0.045 |
Price($) | Vol. | No. |
---|---|---|
0.052 | 69854 | 1 |
0.055 | 11000 | 1 |
0.060 | 210909 | 3 |
0.063 | 32737 | 1 |
0.067 | 10000 | 1 |
Last trade - 16.10pm 05/07/2024 (20 minute delay) ? |
Featured News
CTP (ASX) Chart |