The gold mined in the first 6 months was 176kozs. Gold forecast to be mined from existing mines for the 2nd half is 154kozs, a decline of 22kozs - that is the massive(JW job saving?) affect Tabakoroni had on the results. So with the addition of Mako, second half is now increased to 222kozs. Therefore the annualised rate is 444kozs not the claimed 490kozs.......Interestingly Ravenswood and Syama should now be doing 400kozs annualised on their own - based on last years published forecasts.
- Forums
- ASX - By Stock
- RSG
- Ann: Trading Halt
Ann: Trading Halt, page-88
-
- There are more pages in this discussion • 99 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RSG (ASX) to my watchlist
|
|||||
Last
52.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $1.107B |
Open | High | Low | Value | Volume |
52.5¢ | 52.5¢ | 51.5¢ | $2.700M | 5.188M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 172817 | 52.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
52.5¢ | 163214 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 70000 | 0.520 |
4 | 153688 | 0.515 |
8 | 91531 | 0.510 |
5 | 40849 | 0.505 |
9 | 106150 | 0.500 |
Price($) | Vol. | No. |
---|---|---|
0.525 | 30747 | 3 |
0.530 | 156600 | 4 |
0.535 | 618649 | 2 |
0.540 | 49149 | 2 |
0.545 | 132935 | 7 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
RSG (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online