Just received email from Mr Ian Walker of Metex Res.
It's pretty lengthy email,summary as follows:
NE Goldfields (Laverton area etc) had in excess of 250mm of rain in February,followed by cyclone Monty's contribution.
Their drill rig has been bogged down for 3 weeks.
By the way,re their Whisper trial pit,NOI is still under review,expected to be finalised shortly and then things will be underway.
R/nous