CVN 0.00% 16.5¢ carnarvon energy limited

Ann: Dorado-3 Wireline Results Support Flow Testing, page-194

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 879 Posts.
    lightbulb Created with Sketch. 345
    FEED = Front End Engineering Design i.e. the Basic Engineering which is conducted aftercompletion of a Conceptual Definition or Feasibility Study. Not all projects follow these stages, but it is likely that the Dorado pre-FEED or concept definition stage will have landed on a single development plan and defined the field and production architecture and layout. FEED studies figure out the technical issues and refine the cost estimate for the investment - down to +/- 10% if done well. The output of the FEED stage is a FEED package which becomes the basis for bidding for the EPC contracts.


    .
 
watchlist Created with Sketch. Add CVN (ASX) to my watchlist
(20min delay)
Last
16.5¢
Change
0.000(0.00%)
Mkt cap ! $295.1M
Open High Low Value Volume
16.5¢ 17.0¢ 16.0¢ $636.5K 3.866M

Buyers (Bids)

No. Vol. Price($)
8 624083 16.5¢
 

Sellers (Offers)

Price($) Vol. No.
17.0¢ 745415 12
View Market Depth
Last trade - 16.10pm 04/10/2024 (20 minute delay) ?
CVN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.