That post is incorrect the hole we drilled here is smaller than Watsia. The tubing is smaller also meaing flow will be constrained. Ya has answered this.
below from Ya this is spot on
Waitsia is 50 sq kms with numerous faults. They left the HCS under 2C as it flowed only at W1 & booked most of the gas in the Kingia which flowed on all 5 wells, including Senecio-3 'discovery' well. Porosity cut-off's were applied. 7-11% range was deemed tight, whilst 11+% was good. At WE-2, I'd like to see the Kingia flow 10+ mmcfd here given its depth & tubing constraints etc & then subsequent plans to drill WE-3 next year mayb as the rig will b released post testing for B/Deep-1.
- Forums
- ASX - By Stock
- STX
- Do we need West Erregulla 2 to reach 90 mmscf/d
Do we need West Erregulla 2 to reach 90 mmscf/d, page-3
-
- There are more pages in this discussion • 29 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
(20min delay)
|
|||||
Last
22.0¢ |
Change
-0.010(4.35%) |
Mkt cap ! $644.7M |
Open | High | Low | Value | Volume |
23.0¢ | 23.0¢ | 22.0¢ | $372.8K | 1.655M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
28 | 1272057 | 22.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
22.5¢ | 1014711 | 37 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
27 | 1237369 | 0.220 |
29 | 2163106 | 0.215 |
27 | 1072938 | 0.210 |
18 | 771615 | 0.205 |
33 | 1291857 | 0.200 |
Price($) | Vol. | No. |
---|---|---|
0.225 | 722627 | 31 |
0.230 | 753228 | 15 |
0.235 | 1137756 | 17 |
0.240 | 1385681 | 18 |
0.245 | 1314681 | 17 |
Last trade - 12.30pm 16/10/2024 (20 minute delay) ? |
Featured News
STX (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online