1. The first well produced at the rate of 494 mcf per day, using a 22/64 orifice. During the testing period it was manually decreased at the well head to approximately 320 to 340 mcf per day and then eased don again to about 270 mcf per day. The well has not been stimulated.
2.
The second well initially produced at the rate of 22 to 28 mcf per day. It was then acidized without well bore casing and the flows increased to approximately 135 to 138 mcf per day. This well is currently producing between 110 to 120 mcf per day.
Imagine if the first well increased 5 fold after acidizing it? The second well wasn't the best but i think it's fair to say that they did get the most out of it!