BRU 3.66% 8.5¢ buru energy limited

Ann: Weekly Drilling Report - Ungani 7H, page-2

  1. 26,892 Posts.
    lightbulb Created with Sketch. 4593
    Since the last report, the well has been drilled ahead in in 81⁄2 inch (216 mm) hole to a total
    measured depth of 2,235 metres (total vertical depth of 2,140 metres) and 7 inch (178 mm)
    casing has been run and cemented to a measured depth of 2,226 metres.
    The top of the Ungani Dolomite reservoir is interpreted from drill rate and drill cuttings to have been encountered as prognosed at 2,224.4 metres measured depth with good to excellent oil shows observed, and the 7 inch casing was set into the top of the dolomite reservoir as planned.
    The current operation is carrying out a routine BOP function test with the forward operation as planned to run a 41⁄2 inch (114 mm) cemented liner into to the top of the dolomite to provide an appropriate casing size for the coil tubing drilling operation. The NGD405 rig will then be demobilised from the well to the Miani 1 location and the reservoir section will be drilled underbalanced with coiled tubing.

    only thing getting stuffed up are the sellers this time around
    Last edited by CEOChair: 17/09/19
 
watchlist Created with Sketch. Add BRU (ASX) to my watchlist
(20min delay)
Last
8.5¢
Change
0.003(3.66%)
Mkt cap ! $57.06M
Open High Low Value Volume
8.4¢ 8.5¢ 8.3¢ $12.33K 145.8K

Buyers (Bids)

No. Vol. Price($)
1 41651 8.5¢
 

Sellers (Offers)

Price($) Vol. No.
8.7¢ 28076 1
View Market Depth
Last trade - 16.10pm 22/07/2024 (20 minute delay) ?
BRU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.