I disagree Sevo they ran from lake wells and were desperate to hold on to anything and may have overlooked the NT issue . Wiluna is on the bank of lake way and I think they want their cut I noticed SO4 now site trenches as being a problem for long term drainage !! good point you have made about the whiliamson pit it will last less than a month for full production and will be gone on the trial anyway . I think they are grasping at bringing in MOP to try and boost production as LW won’t support the target 200 k pa they also had to dig a 3.5 km trench to help fill the TRIAL ponds from the pictures they supplied it looks dry and out of water ??
SO4 Price at posting:
89.5¢ Sentiment: Sell Disclosure: Not Held