AEV 7.69% 1.4¢ avenira limited

consortium, page-9

  1. 502 Posts.
    From the Australian Transport & Energy Corridor Ltd (ATEC) website, the latest status report (April 2008) states - for the proposed Mt Isa to Tennant Creek rail sector, 1st stage of PFS with the Fed Govt showed that

    - some new mines needed to open along the route to make the line viable
    - the Adelaide/Darwin railway line needed to be upgraded to cope with heavy mineral loads
    - this would be the last section of Australian inland rail (i.e. linking Melbourne and Darwin via NSW & Qld) to be completed as it requires significant govt investment

    To give an idea of current timing (i.e. as at April 2008), the Border Railway (Moree/Toowoomba) project by ATEC is planned to be built by 2014.

    link: here

    Proposed Inland Rail Line map



    Map link: here
 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
(20min delay)
Last
1.4¢
Change
0.001(7.69%)
Mkt cap ! $37.85M
Open High Low Value Volume
1.4¢ 1.5¢ 1.4¢ $176.1K 12.08M

Buyers (Bids)

No. Vol. Price($)
9 9364967 1.4¢
 

Sellers (Offers)

Price($) Vol. No.
1.5¢ 1843880 5
View Market Depth
Last trade - 16.10pm 23/08/2024 (20 minute delay) ?
AEV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.