hi greenleaf,
This is the ann MOS released, 31/7. There's also mention of Waggamba being shut until an independent inspection is carried out at the site of the accident (see ann 05/08)
Company Announcement
31 July 2008
Contractor Injury at Mosaic Oil Site
Mosaic Oil NL (ASX: MOS) advise that a contractor working at one of Mosaic Oil’s
sites in the Surat –Bowen Basin was seriously injured on 30 July 2008 in an accident
involving high pressure equipment.
The injured contractor has been airlifted to a hospital in Brisbane where he received
urgent medical assistance and underwent surgery. He currently remains under
observation.
Mosaic Oil senior executives are on site and working with the Queensland Department of
Mines & Energy safety inspectors to investigate the cause of the accident.
For further information:
Mosaic Oil: Lan Nguyen – Managing Director (02) 9247 9324
Media: Bill Kemmery – Fortbridge on (02) 8399 0089, mob 0400 122 449
and 05/08:
"Waggamba-5H (MOS 50% Gas & 65% Free Oil/Condensate)
Waggamba-5H remains shut-in pending completion of an investigation into the recent incident
involving high pressure equipment."
- Forums
- ASX - By Stock
- MOS
- clean up flow
clean up flow, page-9
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)