STX 0.00% 21.5¢ strike energy limited

How long would flow rates take? 2 weeks or 3 days?, page-5

  1. 120 Posts.
    lightbulb Created with Sketch. 31
    Markie, unfortunately that sort of testing isn’t the same as the testing being undertaken at West Erregulla 2.

    The wells in that video are specifically for gas storage and the testing being undertaken is for integrity purposes. I.e. to make sure that the casing and tubing haven’t had a loss of containment and risk damage to the environment or potential safety risks with hydrocarbons leaked to undesired locations.

    The point of the testing for Strike is to indicate gas volumes which can be inferred by flow and pressure.
    Last edited by FrankEd: 18/10/19
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
21.5¢
Change
0.000(0.00%)
Mkt cap ! $616.0M
Open High Low Value Volume
21.5¢ 22.0¢ 21.3¢ $1.508M 7.021M

Buyers (Bids)

No. Vol. Price($)
15 1400246 21.0¢
 

Sellers (Offers)

Price($) Vol. No.
21.5¢ 236534 2
View Market Depth
Last trade - 16.10pm 01/11/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.