Well, todays report said over the next 24 hours we can look forward to:
"reduce mud weight, RIH, ream and wash hole, prepare to sidetrack the well... the sidetrack well will be named LUMBA LUMBA-1A-ST1"
..does that mean "...dont look like there is much here...now lets drill this way" ?
- Forums
- ASX - By Stock
- TAP
- philippines drilling update
philippines drilling update, page-6
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)