Page 1 of 6 18 August 2008 Further High-Grade Copper and Silver intercepts at Mount Oxide Perilya Limited (ASX: PEM) is pleased to announce continued exploration success from drilling at the Mount Oxide copper and cobalt project in the Mt Isa region in Queensland. Perilya’s latest round of drilling has confirmed further highly encouraging high grade copper and silver intercepts that extend at depth and below the current resource. The high grade intercepts returned from deeper drilling in drill hole MOXD104 (Figure 1) included: • 17m at 4.2 % copper from 248m, • 32m at 4.5 % copper (uncut) from 287m, • 12m at 15.3 % copper (uncut) and 161 g/t of silver from 345m. MOXD104 was drilled approximately 30 metres south of drill hole MOXD089, which previously reported (5th June 2008) drill intercepts including 31m at 6.2% copper from 346m and 23m at 8.9% copper from 395m. Perilya’s Executive Chairman, Patrick O’Connor, said our new drilling results, which included 12m at 15.3% copper from 345m, were primarily below the current resource. They also further demonstrate the continuity of mineralisation along replaced sedimentary horizons and the excellent potential at depth. “A further hole MOXD105 has also intercepted good visual mineralisation 90m south of the initial intercept and results are pending.” “All these results bode well for the commercialisation and development process, which has commenced, with a number of overseas and Australian parties formerly expressing interest in participating in the further development of the Mount Oxide copper and cobalt project either in partnership with Perilya by way of joint venture, or through outright purchase of the project.” “The continuation of the high grade zones at depth and outside the current resource adds to the project and further demonstrates its potential,” he added. For further information: Investors: Patrick O’Connor Media: Darryl Edwards Executive Chairman Company Secretary Phone: +61 8 6210 2000 Page 2 of 6 Mount Oxide Copper and Cobalt Project - Drill Program and Results In April, a program of diamond drilling commenced with two rigs targeting extensional mineralisation to the north and at depth of the current Mount Oxide resource. Drill hole MOXD104 was targeted to investigate potential at depth around the recently released high grade intercepts from MOXD089 and to understand the geology and plunge of mineralisation. Hole MOXD104 was drilled immediately south of the MOXD089 intercepts within approximately 30m and at a slightly higher elevation and has intersected replaced sedimentary horizons with strong hematite alteration associated with a structurally complex zone. Mineralisation is hosted in brecciated sediments and consists of coarse veins of bornite and chalcocite. The high grade zone is interpreted to be a structural intersection at depth off cross cutting structures and a parallel structure to the main mineralised fault. Lower grade zones between contain strong haematite alteration. The high silver grades are also of significant interest in this deeper zone. The intercepts are interpreted to be oblique to the mineralisation and interpreted to be at least 60% of true thickness. The significant intercepts from MOXD104 include: • 17m at 4.2 % copper from 248m, • 32m at 4.5 % copper (uncut) from 287m, o which includes 1m @ 21.3 % copper from 306m, and 2m at 24.3 % copper from 312m, • 12m at 15.3 % copper (uncut) and 161 g/t of silver from 345m o which includes 5m at 33.0 % copper from 345m Previously reported (5th June 2008) significant intercepts from drill hole MDOX089, include: • 22m at 6.3 % copper and 0.3 % cobalt from 258m • 19m at 3.7 % copper from 315m • 31m at 6.2 % copper from 346m • 23m at 8.9 % copper from 395m Further follow up drilling at depth is also providing significant encouragement with recent hole MOXD105 intersecting good visual mineralisation approximately 90m south of the MOXD89 intercept in a similar geological setting again demonstrating a plunge direction and continuity at depth, the results are still pending. Results are also reported from holes drilled north and above the MOXD89 intercept that contained only altered zones demonstrating the geological complexity in the zone. These mineralised copper zones at depth are outside of the current resource, which is very encouraging for the addition of significant high grade resources at depth. A track mounted rig has recently arrived on site and is testing some of the steep topographic zones north of the planned open pit to test at shallow depth below outcropping copper mineralisation. Good visual mineralisation has been noted during logging with the results still pending from this drilling. Page 3 of 6 Figure 1. Mt Oxide Resource Drill Section 70800Mn, looking north with resource model and MOXD089 and MOXD104 drill holes. Page 4 of 6 Figure 2. Location Plan of drill holes at Mount Oxide deposit with new holes reported. Page 5 of 6 Table 1. Mount Oxide Drill Results 0.5 % Cu cut off, Maximum Internal Dilution 2m, >3 m%. No cut Hole ID Northing Easting Azi Dip From To Interval Cu Ag Co (m) (m) (m) (%) (ppm) (ppm) MOXD098 7845495 331170 270 -75 54 60 6 1.2 5 132 119 125 6 2.0 9 178 146.8 150 3.2 2.0 8 435 MOXD099 7845742 331041 297 -61 33 37 4 1.0 1 963 48 53 5 0.8 1 207 75 83 8 1.4 3 415 86 96 10 0.8 3 782 104 110 6 0.7 4 925 MOXD100 7845742 331041 268 -73 80 87.9 7.9 0.8 6 3014 MOXD101 7845248 330943 267 -70 177.5 178.8 1.3 4.3 22 162 183.9 188 4.1 1.8 9 143 MOXD102 7845304 331022 269 -56 220 223 3 1.7 15 210 240.4 244 3.6 2.3 21 238 308 309 1 3.1 19 120 319 322 3 2.6 23 33 MOXD103 7845515 331128 260 -57 87 95 8 0.7 2 138 259.7 262 2.3 10.3 88 73 MOXD104 7845456 331102 265 -55 156.8 160 3.2 2.2 12 96 171 175.9 4.9 1.4 15 572 248 265 17 4.2 49 469 287 319 32 4.5 44 174 incl 306 307 1 21.3 183 90 incl 312 314 2 24.2 205 65 345 357 12 15.3 161 166 incl 345 350 5 33.0 334 96 incl 346 347 1 58.1 531 280 Page 6 of 6 Background to the Mount Oxide Project (100% owned) The Mount Oxide project is located in the Mount Isa region Western Succession that includes several major sediment hosted breccia copper deposits. The deposit was intermittently mined between 1920 and 1971 by way of a small open pit and underground operation. The project lies 25 kilometres north of the existing Mount Gordon mine operated by Aditya Birla Minerals Limited. The deposit is a chalcocite dominated system associated with strong silica-hematite alteration and copper mineralisation developed on the margins of the hematite core. The mineralisation is hosted in a sedimentary package associated with a strong structural control along the northeast trending Mount Oxide fault and associated cross cutting faults. Competent Person Statement The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Mr. Bruce G.D. Hooper who is a full-time employee of the company and is a member of the Australian Institute of Geoscientists. Bruce Hooper has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Bruce Hooper consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Background to Perilya Perilya Limited is an ASX 200 Australian base metals mining and exploration company. Perilya is investing in the development of its three major projects located in the Broken Hill, Mt Isa and Flinders regions as well as exploration in the surrounding tenements. For more details, visit www.perilya.com.au
PEM Price at posting:
0.0¢ Sentiment: None Disclosure: Not Held