RWD 2.50% 3.9¢ reward minerals ltd

martu opportunity cost, page-58

  1. 630 Posts.
    lightbulb Created with Sketch. 1
    The Alice Springs - Darwin line cost around $1 million/km with 90 bridges/flood culverts/high speed of 110 km per hr and high axle load trains. The grade was also maintained at about 1% with the associated earthworks.

    The Reward line would transport around 2,000 tonnes/per day or 1 train daily. It could backload supplies etc. to the mine site.

    With low loads and low frequency a much lighter line could be built - I mean iron ore lines are designed for 100 million tonnes a year and up.

    A longer term plan would be to get access to the Newman rail system.
 
watchlist Created with Sketch. Add RWD (ASX) to my watchlist
(20min delay)
Last
3.9¢
Change
-0.001(2.50%)
Mkt cap ! $8.886M
Open High Low Value Volume
3.9¢ 3.9¢ 3.9¢ $780 20K

Buyers (Bids)

No. Vol. Price($)
1 7298 3.9¢
 

Sellers (Offers)

Price($) Vol. No.
5.0¢ 7500 1
View Market Depth
Last trade - 10.39am 03/09/2024 (20 minute delay) ?
RWD (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.